Solar Installation in Denver
We treat solar as what it is: a roofing, electrical and construction project. The system is designed around your energy use, installed with the roof and wiring in mind, and connected through the utility properly.
Service scope
What's included
Every project and service request starts with a written scope, so you know what is included before work begins.
- Residential rooftop solar
- Commercial rooftop and ground-mount systems
- Battery storage integration
- Electrical service upgrades
- Permits, inspections and utility interconnection
- Monitoring setup and handover
Start with your energy use and roof
Your utility history, shading, roof orientation and roof condition decide the right system size. If the roof needs replacement soon, we will tell you before panels go on it.
The path to an operating system
A clear proposal covers equipment, installation responsibilities, permits, utility interconnection and timeline. Production and savings figures are estimates based on stated assumptions, not guarantees.
Compare ownership options
Cash purchase, financing and other ownership options have different long-term costs. Ask us about financing and we will walk through the choices that apply to your project.
Local knowledge
Solar in the Denver area
Colorado's sunshine and altitude make solar productive here. Most Denver-area systems connect through Xcel Energy's interconnection process, and some areas are served by local cooperatives with their own rules. HOAs may review placement, and Colorado law limits how far an HOA can restrict solar. Incentives change often, so we review current ones with you.
Process
How a project runs
Site visit
We see the property, talk through goals and check existing conditions.
Scope and price
A written scope, budget and schedule you can make decisions with.
Permits and prep
Permits, selections and ordering materials and equipment.
Build
Coordinated work with regular updates and photos.
Walkthrough
Final inspection, punch list and handover documents.
Questions
Questions and answers
Can a battery be included?
Yes. We size storage around the loads and backup goals that matter to you.
Will solar eliminate my utility bill?
That cannot be assumed. Usage, production, rates and utility fees all affect the result.
How long does installation take?
Installation itself is often a few days. Permits and utility approval usually take longer.
Do you install on commercial buildings?
Yes, including roof review and coordination with building operations.